One of the most common questions Nassau County homeowners ask is how long their bathroom renovation will take. The answer depends on the scope of work, but here are detailed timelines for every type of project General Modernizer completes.
Tub-to-Shower Conversion: 2 to 3 Days
A standard tub-to-shower conversion -- removing the existing tub, installing a shower pan, tiling the walls, and installing a glass enclosure and fixtures -- typically takes 2 to 3 days. Complex conversions with custom tile patterns or a curbless entry may take 4 to 5 days.
Walk-In Shower Installation: 4 to 7 Days
A new walk-in shower installation in an existing space typically takes 4 to 7 days. This includes demolition, waterproofing, tile installation, glass enclosure installation, and fixture installation.
Cosmetic Bathroom Refresh: 3 to 5 Days
A cosmetic refresh -- replacing fixtures, vanity, toilet, and painting without moving plumbing or replacing tile -- typically takes 3 to 5 days.
Full Bathroom Gut Renovation: 10 to 14 Days
A complete bathroom gut renovation -- demolishing everything down to the studs and rebuilding from scratch -- typically takes 10 to 14 days. This timeline includes all phases from demolition through final finishing.
Factors That Affect Timeline
Several factors can affect the timeline of a bathroom renovation: the size of the bathroom, the complexity of the tile pattern, whether plumbing is being relocated, the curing time required for waterproofing and grout, and the availability of materials. We provide a precise timeline during your free consultation based on the specific scope of your project.